Inert Waste - Muck Shifting

We doubled the width of the pad behind the existing sheds to enable an extension to be erected along the full width of the sheds.

The machine pictured is from a friend in Alnwick who does this type of work for us.

We imported subsoil from a recycling centre to make this pad.

Pictures show the formation of a new access road down the side of the building to access the new pad.

 
Share This